After conceding that I wouldn't get around to making cabinets for the pantry any time soon (say, within 3 years...), we'd headed back to Ottawa Valley Kitchens and had them "fill the void". We matched everything from the kitchen, with some subtle tweaks - upper cabs went to the ceiling (no crown moulding) and doors were 5-piece in the same style (no raised panel). Stain was the same, hardware was the same, and the granite was the leftover from the kitchen countertops. The cabinets were actually installed back in November, with the granite about a week later. However, it's taken me this long to finally install the sink - the cutout for the sink was easy, but without the proper bit for the faucet hole, it took a loooong time to finally get that through (think Escape from Alcatraz, digging behind the cell sink...).
Anyway, it's done now, and was worth the wait. We still have some shelving to do on one wall (with a place for mops and brooms and such), and maybe a cork/whiteboard on the back wall.
Couldn't have gotten them installed without Deavan's help!
And, because she's so cute, here are a couple of pictures of Ruby!